Skip to content

Llandudno Hospital

Llandudno, North Wales

Project: Medical Gases Installation
Client: M A Cooper Projects Ltd
Location: Llandudno, North Wales
Sector: Healthcare

Overview:
Llandudno Hospital required an upgrade and extension of its medical gas infrastructure to support safe, reliable clinical services across key patient care areas. The project was delivered within a live hospital environment, ensuring continuity of care while enhancing compliance with current healthcare standards. The installation was designed to improve resilience, safety, and capacity for both current and future clinical demands.

Scope of Work:

  • Oxygen
  • Medical Air (4 bar)
  • Surgical Air (7 bar)
  • Vacuum
  • Anaesthetic Gas Scavenging System (AGSS)
  • Area Alarms and Remote Switches

Project Highlights:

  • Engaging with BOC to replace & upgrade Oxygen VIE as well as supply of new Surgical Air and Vacuum plants
  • Full technical review of all existing services alongside the full design of the new scheme
  • Close coordination with clinical staff and hospital management ensured minimal disruption
  • Professional installation carried out by certified Medical Gas Competent Persons
  • Works were carefully phased to maintain uninterrupted hospital operations
  • Comprehensive testing and validation including arranging of QC Pharmacist

Outcome:
The medical gas installation at Llandudno Hospital was delivered successfully, meeting all project objectives and regulatory requirements. The completed system provides a reliable and compliant infrastructure that supports safe clinical practice while enhancing operational resilience. The works were integrated seamlessly into the existing hospital environment, ensuring continuity of patient care and delivering a future-ready solution aligned with the hospital’s ongoing service needs.

Recruiting Now